The project is key for enabling power supply to the seaport Sukhodol
Customer: OOO Seaport Sukhodol
Works performed: the general contract package, including sourcing of equipment, construction and engineering, testing and commissioning (subcontracting OOO Energo SK, a Group company)
Launch date: 2021
Customer: IC Ictas Insaat (Turkey)
Length: 699 km
Works performed: full-cycle construction of a bridge over the Izhora river, two slip roads over the Warsaw-bound railway tracks, a bridge over Pulkovskoe chaussee, and three overhead junctions (in the villages Voyskorovo and Dedorovskoye and over the Vitebsk-bound railway tracks)
Completion date: 2019
Объект: Строительство комплекса перегрузки угля «Лавна» в морском порту Мурманск Заказчик: ООО «Морской торговый порт Лавна»
Генподрядчик: АО «ТЭК МОСЭНЕРГО»
Технические характеристики: Общий годовой грузооборот на полное развитие - 18 млн. тонн экспорта угля в год
Виды выполняемых работ: Строительство на условиях «под ключ», включая проектные работы, поставку оборудования и материалов, строительно-монтажные и пусконаладочные работы.
Срок реализации: 2024
The project is key for enabling power supply to the seaport Sukhodol
Customer: OOO Seaport Sukhodol
Works performed: the general contract package, including sourcing of equipment, construction and engineering, testing and commissioning (subcontracting OOO Energo SK, a Group company)
Launch date: 2021
This transmission line was constructed to increase the reliability of power transmission lines in Russian Far East
Customer: PAO FSK EES
Works performed: the general contract package, including sourcing of equipment, construction and engineering, testing and commissioning works (subcontracting OOO Energo SK, a Group company)
Launch date: 2021
A 330 kV Talashkino Substation was built in 1970 and is a backbone of power infrastructure in Smolensk Region. Some of the transmission lines it feeds are part of the BRELL (Belarus, Russia, Estonia, Lithuania, Latvia) circular power system. The project increased the reliability of trunk power lines in the European part of Russia.
Customer: PAO FSK EES
Works performed: a full-cycle modernisation and refitting project for a 330 kV substation, including sourcing of equipment, construction and installation, testing and commissioning works
Launch date: 2018
This transmission line was constructed to increase the reliability of power transmission between the power systems of Russia’s Central and North-West federal districts.
Customer: PAO FSK EES
Length: 261.5 km
Works performed: a full-cycle construction project for a 330 kV single-circuit overhead line, including design and surveying works, sourcing of equipment, construction and installation, testing and commissioning works
Launch date: 2018
Customer: OOO GEKh Engineering
Designed by: OOO Mosenergoproyekt
General Contractor: AO TEK Mosenergo
Capacity: 160 MWt
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment supplied:
Launch date: 2021
The project addressed power surplus in the North-West unified power grid, providing a spillover solution. Innovative solutions were used to manufacture the wiring and masts for the line.
Customer: PAO FSK EES
Length: 191.5 km
Works performed: a full-cycle construction project for a 750 kV single-circuit overhead line, including sourcing of equipment, construction and installation, testing and commissioning works
Launch date: 2018
Customer: OOO GEKh Engineering
Designed by: OOO Mosenergoproyekt
General contractor: AO Mosenergo
Capacity: two combined-cycle generation units, 180 MWt each
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment installed: two generation units, including:
Launch date: 2019
Customer: PAO RusHydro
Capacity: 320 MWt
Works performed: the general contract package, including full-cycle construction of the hydro facilities; development of working design documents for the hydromechanical equipment; manufacture and supply of the hydromechanical equipment, support systems, and other equipment of the powerhouse and control dam
Completion date: 2019
Customer: PAO Rushydro
Designed by: AO Institut Teploproyekt
General contractor: AO TEK Mosenergo
Capacity: two pulverised coal-fired generation units, 60 MWt each
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment supplied:
Launch date: 2019
Customer: PAO RusHydro
Designed by: AO Institut Teploelektroproyekt
General contractor: AO TEK Mosenergo
Capacity: four combined-cycle generation units totalling 193 MWt
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment supplied:
Launch date: 2017
Asset: Adlerskaya TES
Customer: PAO OGK-2
Designed by: OOO Mosenergoproyekt
General Contractor: AO TEK Mosenergo
Capacity: two combined-cycle units, 180 MWt each
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment supplied:
two PGU-180T generation units featuring two V64.3А gas turbines (produced by Ansaldo Energia (Italy), supplied by AO Power Machines), a double-circuit waste heat boiler (produced by Podolsk Machinebuilding Plant and supplied by AO Power Machines), and a 48/62-7,4/0,12 steam turbine (produced by Kaluga Turbine Plant and supplied by AO Power Machines).
Launch date: 2012
Asset: TETs-12.
Construction of a PGU-220T Generation Unit
Customer: OOO Mezhregionenergostroy
Investor: PAO Mosenergo
Designed by: OOO Mosenergoproyekt
General contractor: AO TEK Mosenergo
Capacity: a 220 MWt combined-cycle unit
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment supplied: a combined-cycle 220 MWt generation unit, featuring:
Launch date: 2015
Asset: TETs-16.
Construction of a 420 MWt combined-cycle generation unit to replace and decommission the outdated existing unit
Customer: ООО Mezhregionenergostroy
Investor: PAO Mosenergo
Designed by: OOO Mosenergoproyekt
General contractor: AO TEK Mosenergo
Capacity: a 420 MWt combined-cycle unit
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment supplied: a 420 MWt combined-cycle generation unit, featuring:
Launch date: 2014
Recognition: in 2015, the project was awarded a diploma by the Moscow Mayor’s Office as the best utility infrastructure project of the year in Moscow
Asset: TETs-20.
Construction of a combined-cycle generation unit PGU-420T
Customer: ООО Mezhregionenergostroy
Investor: PAO Mosenergo
General contractor: AO TEK Mosenergo
Capacity: a 420 MWt combined-cycle generation unit
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment: a 420 MWt combined-cycle generation unit, featuring:
Launch date: 2016
Asset: Nizhneturinskaya GRES.
Construction of two 230 MWt combined-cycle generation units
Customer: PAO T Plus
Designed by: AO Teploelektroproyekt
General contractor: AO TEK Mosenergo
Capacity: two combined-cycle units, 230 MWt each
Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing
Core equipment supplied: two 23 MWt combined-cycle generation units, featuring:
Launch date: 2015